Green Transportation

Ludhiana Railway Station All Set To Be Solar Powered

Ludhiana Railway station is all set up for a 2MW rooftop solar power system that will help fulfil its power requirement. The move comes following the railway ministry’s plan to introduce rooftop solar panels in 8000 stations across the country along with land available with it to generate 500 MW in total. Interestingly, with the overall rooftop solar targets in disarray at just 2GW achievement out of the targeted 40 GW by 2022, the railway’s rooftop plans could turn out to be important in more ways than one for India.

Presently, the electricity demand of the station is being fulfilled by the Punjab State Power Corporation Limited, costing the station an average of Rs.25 lakhs per month. However, this expenditure is to be cut down by 60% once the solar panels are installed on the rooftops of the station.

A team of Azure Power Company, which has signed a contract with the railway ministry for the solar plant installations, visited the station in Punjab to identify the suitable sites where the rooftop solar energy system would be set up. A typical project of this size could be done in six months or less, and it remains to be seen how long this one takes.

“Around 2 MW of power generating system will be received by the Ludhiana railway soon. It will cater to half of its present electricity needs. The solar photovoltaic cells will be installed on the rooftop of the main building and provide power to all the offices, power cabin, waiting hall, etc. It will also be installed on the roofs of the guesthouse and carriage and wagon (C&W) buildings. One of the major reasons behind the commencement of this project is to bring down the monthly energy bill and to reduce the dependence on power utilities,” said the Ludhiana station director Abhinav Singla.

Senior section engineer (Powers) Brijraj said that last month; the railway authorities had to pay Rs.26 lakh to the Punjab State Power Corporation Limited for using their utility. “The installation of solar energy system will definitely help in saving a huge amount,” he said.

 

 

I am Renew

Recent Posts

Modi Govt approved loan subsidies for 47 ethanol projects in Bihar

The central government has informed Parliament that 47 projects in Bihar have received in-principle approval…

3 days ago

Central govt urges Dairy Federations to join circular economy, biogas revolution

The Secretary for Department of Animal Husbandry & Dairying (DAHD), Alka Upadhyaya, has called on…

3 days ago

India’s ethanol blending reaches 16.9%, says Hardeep Singh Puri

Just as the quest of the nation for green energy is gaining unprecedented pace in…

3 days ago

Hithium to Supply 640MWh Energy Storage for Woolooga BESS Project

Hithium, a global energy storage product provider, announced the supply of 640 megawatt-hours (MWh) of…

4 days ago

BCL Industries to build 150 KLPD ethanol project; gets nod for 75 KLPD bio-diesel plant

BCL Industries has announced that it has received environmental clearance to set up a 150…

4 days ago

Blue Planet acquires Smart Environmental Group to strengthen its operations in New Zealand

Singapore headquartered sustainable waste management provider Blue Planet Environmental Solutions Pte. Ltd. has acquired Smart…

4 days ago