NTPC Tenders 25 MW Floating PV Project in Andhra Pradesh

FacebookFacebookTwitterTwitterLinkedinLinkedinGmailGmail

National Thermal Power Corporation has issued a tender for the development of 25 MW Floating Solar PV Project at NTPC Simhadri in Andhra Pradesh.

The scope of work includes the design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of Solar Photo Voltaic Plant based on Open category PV modules and cells.

Apart from this, the tender document mentions a multitude of tasks to be performed by the successful bidder.

The final date for the submission of bid is January 22, 2019, and the reverse auction will take place at a later date which will be notified. The tender document can be accessed here.

Prospective bidders are required to provide GSTIN number at the time of purchase of bidding documents, the tender document mentions.

Last week the Indian government slashed the Solar Capacity installation which was to be developed by NTPC to just 3 GW from 15 GW.

Under Tranche-I, 3,000 MW of solar capacity was to be developed from 2014-15 to 2016-17, under Tranche-II, 5,000 MW was to be developed from 2015-16 to 2017-18, and under Tranche-III, 7,000 MW was to be developed from 2016-17 to 2018-19, Singh informed the House.

New & Renewable Energy Minister R K Singh in his reply said, “The Ministry of New and Renewable Energy (MNRE) issued the guidelines for selection of 3,000 MW of solar PV capacity in March 2015. The entire capacity of 3,000 MW Tranche-I has been awarded. Capacity of 2,750 MW has already been commissioned and remaining 250 MW capacity is under construction. Under the program, it was envisioned that the then costlier solar power will be bundled with cheaper thermal power, so as to supply the combined power at an affordable price.”

“Since the price of solar power has fallen recently, it is not proposed to take up Tranche II(5GW) and III(7GW),” Singh announced in Lok Sabha winter session. Power minister also added that cumulative renewable energy capacity of 73.35 GW has been installed in the country up to October 2018. To achieve the balance target of 101.65 GW( out of the 175 GW target), an investment of about Rs 5.12 lakh crore has been estimated as per average current capital cost.

I am Renew

Recent Posts

CBG blending mandate needs to come with formal structuring and certification program– Mahesh Girdhar, CEO, EverEnviro

1. The mandate for blending Compressed Biogas (CBG) with natural gas has come into effect…

1 day ago

Australia’s Arvensis Group to build Rs 150-cr CBG plant in Andhra Pradesh

Andhra Pradesh is striving towards greening its energy sector with quite some speed. In a…

5 days ago

CBG-CGD Synchronisation: GAIL, Gujarat Gas & Baba Deep Singh sign tripartite agreement for CBG supply in Punjab

With an objective to bolster India’s green energy goals, a Tripartite Agreement has been signed…

5 days ago

MNRE Minister Pralhad Joshi launches Green Hydrogen Certification scheme

The Union MNRE Minister Pralhad Joshi launched the Green Hydrogen Certification Scheme of India (GHCI)…

5 days ago

5MW green hydrogen plant operationalised at BPCL Madhya Pradesh Refinery

India’s energy conglomerate Bharat Petroleum Corporation Limited (BPCL) has commissioned a 5MW green hydrogen plant…

5 days ago

Europe puts ‘Biomass’ satellite into orbit to track forests & carbon storage

In a historical development, the European Space Agency (ESA) has successfully launched its pioneering ‘Biomass’…

5 days ago